Some Milestones
Our first Lined/Floating Covered Potable Water Reservoir installed 1990
Our first (and Australia’s first) Lined/Floating Covered reservoir for bulk Molasses Storage installed 1991
Our first Double-lined ponds with Leak Detection System (for Toxic Effluent) installed 1992
Our first Floating Cover for Bio-gas Harvesting installed 1997
Our first Landfill Liner System installed 2002
Our first Floating Cover for Evaporation Control installed 2002
Our first (and World’s first) Lined/Floating Covered Reservoir for bulk concentrated Caustic Soda installed 2004 (and 4 more since)
Our biggest individual liner: 37.2 hectares of 1.5mm thick HDPE (second biggest: 32 hectares at same site)
Our biggest dam with liner: Lake is approx 5,000 hectares when full – Liner on dam wall only... approx 70,000m².
Our best lining effort in one shift: 14,000m² of 1.5mm HDPE – deployed, joined and tested with a site team of 12 men.